1257 results found
    1. CombiPlast - Case erecting and bag placing

      CombiPlast - Case erecting and bag placing

      CASE ERECTING AND BAG PLACING by our CombiPlast Machine The CombiPlast case/box erector with bag inserter is a remarkable and unique machine which combines box erecting- & bag inserting technology in one compact solution. Feeding plano’s and prefabricated bags in, it provides you a bag in box ready to be filled with your product. This with a speed up to 16 boxes per minute. Your boxes are mechanically squared and bottom taped. Optional hotmelt can be implemented. Prefabricated Easy Open bags, with a possible thickness down to 10 μm, are placed tightly in your erected boxes. Bags are perfectly suited for all your box sizes.

    2. Commander C - General Purpose Drive

      Commander C - General Purpose Drive

      The Commander C is our general purpose frequency inverter. The Commander C series is available in 3 variants, the Commander C200, the Commander C300 and the Commander C300 PM. The Commander C200 provides maximum machine performance in open loop vector or sensorless motor control (RFC-A). Characteristics: * Flexible integration through many available fieldbuses * Logic Blocks, PID, Motor Pot * Thermistor input * PLC onboard (CoDeSys) * SD card option for saving and copying parameters and/or PLC programs * 24V backup option * RS485 / Modbus RTU option The Commander C300 provides maximum machine performance in open loop vector or sensorless motor control (RFC-A), combined with machine safety through the availability of Safe Torque Off inputs. Characteristics: * Flexible integration through many available fieldbuses * Logic Blocks, PID, Motor Pot * Thermistor input * Double STO (Safe Torque Off) * PLC onboard (CoDeSys) * SD card option for saving and copying parameters and/or PLC programs * 24V backup option * RS485 / Modbus RTU option

    3. Compact positioning system GEL 6109 for standalone use

      Compact positioning system GEL 6109 for standalone use

      Automatic positioning systems save time during format adjustment, increase process reliability and boost the efficiency of production lines. The compact SeGMo positioning drive GEL 6109 with batteryless multiturn absolute rotary encoder, gear and motor as well as integrated power and control electronics significantly reduces the effort required for changeover. In addition to the version for connection to the SeGMo-Box central control unit, this drive is now also available with integrated industrial Ethernet interfaces for standalone use. The drive is available in 2.5 Nm and 5 Nm versions and is ideal for replacing existing handwheels. Thanks to its graduated housing shape, it fits into almost any gap. The hollow plug-in shaft also saves installation space. This eliminates the need for an additional coupling to connect to the machine shaft and thus increases design freedom. – Monitoring of important system parameters ensures reliable operation (overload protection) – Ready for use immediately after power on due to absolute multiturn position detection – Batteryless system – Maintenance-free due to sealed-for-life lubrication – Optional use with the SeGMo-Box or as a standalone device – Optionally with cULus component recognition

    4. Compactors for Foam rubber and EPS (Expanded Polystyrene)

      Compactors for Foam rubber and EPS (Expanded Polystyrene)

      Compress EPS into blocks Our machines compress EPS boxes into stackable blocks that take up little space. The compaction of the volume is 50:1. RUNI models SK120-200-230-370 - compact all types of large foam and EPS: *Compact large foam and EPS waste *Large volume reduction (>50:1) *Large warranty coverage *Efficient pre-crusher distributes the material *Produces very compact, handy blocks *Automatic operation - virtually no staff required *A sensor monitors the fill level *No risk of overfilling or idling

    5. Company building Dimensio Verpakkingen Almere

      Company building Dimensio Verpakkingen Almere

      Dimensio Verpakkingen has been located in Almere for more than 25 years and wanted to realize a new company building due to growth. In addition to distribution space, the building must provide high-quality office space and social facilities. We have already realized new company buildings twice before for this flourishing company. The Stichtsekant Business Park in Almere offers the ideal solution due to its favorable location and the availability of large-scale logistics plots. We have realized the 34,000 sqm logistics building on the Stichtsekant business park on a plot of approximately 5.2 hectares. The building meets all the requirements for a modern logistics operation.

    6. Company building Dimensio Verpakkingen Almere

      Company building Dimensio Verpakkingen Almere

      Dimensio Verpakkingen has been located in Almere for more than 25 years and wanted to realize a new company building due to growth. In addition to distribution space, the building must provide high-quality office space and social facilities. We have already realized new company buildings twice before for this flourishing company. The Stichtsekant Business Park in Almere offers the ideal solution due to its favorable location and the availability of large-scale logistics plots. We have realized the 34,000 sqm logistics building on the Stichtsekant business park on a plot of approximately 5.2 hectares. The building meets all the requirements for a modern logistics operation.

    7. Company Building Koninklijke Euroma Zwolle

      Company Building Koninklijke Euroma Zwolle

      At the Hessenpoort industrial estate in Zwolle, we realized a company building of no less than 26,000 sqm for Koninklijke Euroma. The building contains a fully automated warehouse and state-of-the-art mixing installations. Thanks to more capacity and speed, Euroma can now supply many more flavorings. The new location works with the latest mixing installations for herbs, with which Euroma grows with the demand in the market. Sustainability and energy saving played an important role in the construction of the new production location. With a view to continued growth in the future, it is also possible to realize expansion at the new location.

    8. Company Building Koninklijke Euroma Zwolle

      Company Building Koninklijke Euroma Zwolle

      At the Hessenpoort industrial estate in Zwolle, we realized a company building of no less than 26,000 sqm for Koninklijke Euroma. The building contains a fully automated warehouse and state-of-the-art mixing installations. Thanks to more capacity and speed, Euroma can now supply many more flavorings. The new location works with the latest mixing installations for herbs, with which Euroma grows with the demand in the market. Sustainability and energy saving played an important role in the construction of the new production location. With a view to continued growth in the future, it is also possible to realize expansion at the new location.

    9. Company building Mocca d'Or Zwolle

      Company building Mocca d'Or Zwolle

      Coffee roasting factory Mocca d'Or wanted to expand its company building. And that while production continued to run. A great challenge for our project team. By cleverly dividing the demolition, expansion and new construction into phases, Mocca d’Or was able to continue its business activities as usual. The part of the Mocca d'Or building where the coffee roasting area was located was maintained. The existing office, warehouse and dispatch area have been completely demolished. We then realized a new packing area, shipping area, loading pit, office spaces, canteen and warehouse spaces in various phases. Finally, the outside area was redesigned.

    10. Company building Mocca d'Or Zwolle

      Company building Mocca d'Or Zwolle

      Coffee roasting factory Mocca d'Or wanted to expand its company building. And that while production continued to run. A great challenge for our project team. By cleverly dividing the demolition, expansion and new construction into phases, Mocca d’Or was able to continue its business activities as usual. The part of the Mocca d'Or building where the coffee roasting area was located was maintained. The existing office, warehouse and dispatch area have been completely demolished. We then realized a new packing area, shipping area, loading pit, office spaces, canteen and warehouse spaces in various phases. Finally, the outside area was redesigned.

    11. Company building Ruitenberg Ingredients Ruinerwold

      Company building Ruitenberg Ingredients Ruinerwold

      Due to the growth of the business activities, Ruitenberg Ingredients wanted to realize a new production location behind the existing production location in Ruinerwold. The total production area at this location was doubled, allowing Ruitenberg to move forward again. The company building consists of 4,021 sqm on the ground floor and 704 sqm on the upper floor and has the characteristic Ruitenberg style. It meets current and foreseeable requirements regarding quality, food safety and the environment. For example, the building gained the BREEAM Outstanding certification. The new production location consists of office / R&D spaces and ancillary spaces, production and test spaces, logistics spaces, conditioned (both hot and cold) spaces and a number of shell spaces for future expansion.